Monday, May 31, 2010

Adhering the Deck






I glued the deck on the other day. I made at least one small error that I detected a little too late. I didn't quite have the center line of the deck matched up with the keel. It's off about a 1/2 inch near the tail but eventually gets corrected by the the nose. I can definitely see the misalignment, especially with the book-matched knots on the deck that are located near the rail. The knots on one side will be closer to the rail than the other side. Fortunately, the wax on the deck will obscure it a little and I won't have to think about it every time I see it.

I was a little anxious about gluing the deck, for fear that it might crack. I live in the high desert and there is almost no humidity. The deck had been sitting out for over a year and I'm sure it was extremely dry and perhaps even brittle. I thought of an idea to reconstitute the moisture in the deck. I brought the board into one of the bathrooms, along with a pot of water and a camp stove. I boiled the water and created a steam room, letting the board sit in there for about four hours. I took the deck out of the makeshift steam room and glued it on. Other than the aforementioned mishap, the deck looks great and cracked ever so slightly in only one location. An easy fix with Titebond and saw dust.

Everyone talks about the number of clamps required for this project, and they always sound like they are exaggerating. They're not. I used 80 clamps when gluing on the deck! Sixty three inch clamps, 20 two inch clamps and 15 slats on the rocker table. I could have probably used more clamps.

Progress at last





It's been a little while since I posted any new developments. Namely because there haven't been any new developments, at least with the building of the board. That's not entirely true and I'll share a couple of small updates in a moment.

This spring we had a baby boy on March 15. His name is Charlie. At his eight week check-up, his pediatrician heard an unusual sound in his heart. We went to see a pediatric cardiologist later that day and we discovered that Charlie has several heart defects - an enlarged heart (left ventrical), stenosis of the aorta, and a small hole. We were life flighted down to St. Joseph's Hospital in Phoenix later that evening, and two days later, Charlie had coarctation surgery to correct the narrowing (stenosis) of his aorta. The other issues with his heart seem to be related to the stenosis of his aorta, and we're crossing our fingers that they will correct themselves.

That experience kind of put my life in perspective.

Even with all the excitement, I managed to some minor progress with the board. I planed the tops of the bead and cove strips to create a flat landing surface for the deck. I'm not sure I did a very good job of it, but the strips were getting paper thin and I didn't want to risk planing them any further. I was concerned that there wasn't going to be enough surface area for adhering the deck. I attempted to amend this situation by gluing small pieces of wood along the ribs to create more internal surface area along the ribs and keel. I'm sure it increased the weight of the board, but that's okay if it keeps the deck secure. I also added blocking for the fin. I'm still not sure if I'm going to use the fin box included with the kit or just glass on a D fin.

That's all for now.

Sunday, October 18, 2009

Bead and Cove Strips








After a nearly three month respite, I'm back to building the Waterlog. When I left off, I had just completed adhering the chine log and one or two of the bead and cove strips. I've since glued about six or seven additional bead and cove strips and it's starting to look more like a surfboard. The PVC clamps come into their own just as the 2" clamps can longer get around the strips.

All was going well until I noticed that there are about three frames on the left hand side where the bead and cove strips are not quite in contact with the frames. There is probably a 1/16" gap at the middle frame, but less on the two contiguous frames. This is the case with only about two bead and cove strips, then there is continuous contact with all them. I'm concerned that section of the rail will not be "fair," which the directions ominously warn not to let happen. It did, and now I'm going to have to deal with it. I thought squeezing that section of the rail closer to the frames might work. I was able to squeeze it closer; unfortunately, I stressed the entire section of the rail doing so. Later, when I was wiggling the next bead and cove strip on that section of the rail, twelve inches of the rail lifted off the starter rail. Oops. I quickly re-glued that section and clamped it down. I'm going to have to try some other solution. Maybe sanding it "fair" when I'm shaping the rails will work. In the meantime, I'm wondering if I should reinforce that section from the interior sided of the rail. Perhaps with some addition Tite Bound.

I desperately need to pick up the pace of this project, as the leaves are falling and the temperatures are beginning to drop. I doubt that I should be glassing the board in the garage when it gets too cold. It has also been made clear that the cars get first priority in the garage as soon as the first snow arrives. Besides, I want to start surfing on this new water craft.

Above are a few pictures of the Waterlog as the bead and cove rails are being adhered. Sorry, no images of the rail section separating from the board.

Quick update...I emailed Mike L, explaining the gap issue and here's his response: If there are gaps, but you're already well above those points with your railing, just mix up some thickened epoxy with sawdust and smear it in the those areas on either side of the frame(s). The will just support the strips and keep the board a little stronger in those areas. If you are still railing, and some of the frames are pulled away enough where it is hard to keep the shape with the rail strips, you might cut some little shims from scrap cedar to push into the gap. This will give the strips something to land on i those areas. Little by little, you want to come back to the frames so that the get gap gets progressively smaller. This is the best way to keep the rail shape as true as possible.

I'm going to use the epoxy and saw dust solution, as the gaps aren't very large. Within two bead and cove strips, they're laying nicely on the frames again. I don't think this will be a huge issue in the long run.

Saturday, July 25, 2009

Chine log and starter rail

After a one month hiatus, I finally glued the chine log and starter rail to the board. Not much to report here other than steaming each in order to bend them around the nose was easier than I thought. The cedar becomes very pliable after just a short time under steam. 

Next step will be to start building up the rails. 

Sunday, June 28, 2009

The 3M 5200 Has Finally Dried

I heard back from Mike at Grain, and he suggested to just let the adhesive cure. It turns out, I over looked the 3m 5200 fast cure that was packed with the kit. Lesson learned, inventory everything before beginning the project. 

Anyway, the adhesive has finally cured and the board looks good. I'm ready to prepare the board for the chine log and bead and cove strips. 

Saturday, June 13, 2009

Is the Frame Glued to the Panel?

Well, I let the 3M 5200 adhesive cure for a week and it's still a little tacky. I used the wrong 3M 5200 adhesive, not the fast cure, as the instructions indicate. I'm not sure what to do at this point, so I emailed Mike and Brad at Grain to get their feedback. I'll wait to see what they suggest to remedy this issue.

Sunday, June 7, 2009

Frame Glued to Panel












Today I glued the internal frame to the bottom panel. Before I began the gluing, I had to prepare the keel and frames. After gluing the keel together, I noticed that the keel was not perfectly straight. I was concerned that it would not adhere to the panel in a true fashion. To ensure that it would be glued true, I cut several small pieces of the marine plywood that the frames and keel were cut from and lined them along the center of the board. I temporarily glued them there with Elmer's glue. I did this in about eight locations along the center of the panel and it kept the keel quite straight. These stays can be seen in the top three images.

The frames, or ribs, fit quite loosely on the keel. After fitting the frames on the keel, I found that whenever I lifted the keel, several frames would fall out. Furthermore, the first frame (closest to the nose of the board) did not fit at all. I gingerly sanded the slots on the frame and keel so they would fit better. While I was doing this, the nose of the keel snapped off right where the slot for the first frame is located. Ouch! I glued it with Titebond III, clamped it, and said a few prayers. After two days, I removed the clamps and it appeared that my prayers were answered. I still had to sand the slot on both the frame and keel to make sufficient room for the two to fit properly. I pushed my luck and the nose snapped again while sanding. This time I said #@%$ ! I glued it again and said some more prayers. Finally learning from my previous mistake, I sanded only the frame and then glued it to the keel. I didn't glue any of the other frames.

Everything seemed to be in order to glue the keel and frames to the panel. I sought the assistance of my beautiful and patient partner, Vanessa, and our lovely daughter, Malia. I smeared the 3M 5200 marine adhesive all over the keel and frames, while Vanessa looked on ready to help me place the gluey mess on the panel. Meanwhile, Malia snapped about fifty pictures of the process. She took all photos for this entry while rollerblading around us to get the best action shots.

Once we laid the keel and frames to the panel, we started locking down the stays on the rocker table. This took a bit of time. We started from the center and worked our way out to the nose and tail. We proceeded slowly as we began to crank down the stays. We tightened both the top and bottom stays. We tightened the bottom stays because that was the only way we could get the outside of the frames to make contact with the panel. Once all the stays were tightened, I applied more 5200 and "filleted" it along both sides of the keel and each of the frames. I think it looks like it should but I won't know if I/we did it correctly until I release the stays and everything remains in place. I'm going to let the 5200 set for the week.

One observation I would like to share is this process is very messy. I had 5200 on everything and probably went through a roll of paper towel trying to keep the ubiquitous white stuff from getting the best of me.

A quick update, I bought 3M 5200 marine adhesive to adhere the keel and frame to the panel. Make sure you get the fast drying 5200. It's been three days since I glued everything and it's still tacky. I might be waiting more than a week for this stuff to cure.